Presented in Table 8.1.2 are the actions taken by the Landsat Project Science Office (NASA/GSFC) and the Image Assessment Team (USGS/EDC) to provide the best possible calibration for Landsat ETM+ imagery.

Definition of Terms:

Acquisition Date - date image was acquired by the satellite

Processing Date - date image was processed to Level 1 by the Processing System; this date should be close to the date the scene was ordered and received by the customer


Table 8.1.2 Calibration Action Time Line
Problem/
Update
Bands Affected
Acquisition Dates
Processing Dates
 
 
 
1999
2000
2001
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
B6 Calibration
6
all
bias error in calibration procedure, subtract 0.31 radiance units for calibrated imagery
calibration corrected

B6 Gain Swap Period

6

11/24/99 to
12/08/99

 
B6 out of calibration
bias error in calibration procedure, subtract 0.31 radiance units
B6 out of calibration
B6 calibration corrected
Lmin/Lmax update
all
all
use first set of Lmin/Lmax's to scale Level 1 DN to radiance
use second set of Lmin/Lmax to scale Level 1 DN to radiance


Summary of Required Actions

Problem/Update Details/For more details...
B6 Calibration Independent calibration teams discovered an offset error in the B6 calibration. This was corrected through processing on 21 DEC 2000. For users with data processed before 21 DEC 2000, subtract 0.31 W/m2 sr um from the radiance image for calibrated data.
B6 Gain Swap An error caused the two B6 gains to be swapped, resulting in an intermediate gain state. Attempts to correct the problem were implemented then lost and implemented again on 01 Jul 2001.
Lmin/Lmax update Using updated information on the pre-launch calibration, the scaling factors were adjusted beginning 01 Jul 2000 to make better use of the dynamic range.